W BIGS-GRIDLY RD over HAMILTON SLOUGH
0.4 MI S OF B ST · County 007, California · Built 1950 · 2 Lanes · 800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
39.406897, -121.716217
This bridge is in worse condition than 94.5% of bridges in County 007. The average bridge in California is 0 years old; this one is 76 years old.
Nearby Bridges
6TH STREET over HAMILTON SLOUGH
Built 2014
FARRIS ROAD over BELDING LATERAL
Built 2023
FIRST ST over HAMILTON SLOUGH
Built 1938
AFTON ROAD over BELDING LATERAL
Built 2023
PRYDE AVE over NO NAME DRAIN
Built 1936
B STREET over HAMILTON SLOUGH
Built 1996
W BIGGS GRIDLEY RD over BR SUTTER BUTTE CANAL
Built 1948
STATE ROUTE 99 over DRAINAGE DITCH
Built 1988
STATE ROUTE 99 over HAMILTON SLOUGH
Built 1950
E RIO BONITO RD over HAMILTON SLOUGH
Built 1930
Bridge Details
- Structure #
- 12C0058
- Year Built
- 1950
- Length
- 7.3 m (24 ft)
- Max Span
- 7 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $70,000
- Total Project Cost
- $117,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.