ROAD SS over ORTIZ DRAIN
0.8 MI S OF RD #61 · County 021, California · Built 1950 · 1 Lanes · 13 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
39.450981, -122.097814
This bridge is in worse condition than 57.9% of bridges in County 021. The average bridge in California is 0 years old; this one is 76 years old.
Nearby Bridges
ROAD #61 over WILLOW CREEK
Built 1949
ROAD 61 over PROVIDENT CANAL
Built 1948
ROAD 62 over COLUSA DRAIN
Built 1960
ROAD 64 over COLUSA DRAIN
Built 1941
ROAD 66B over COLUSA DRAIN
Built 1940
ROAD #61 over COLUSA DRAIN
Built 1977
ROAD 57 over SWALLOW DRAIN
Built 1945
NORMAN ROAD over WILLOW CREEK
Built 1973
ROAD 59 over COLUSA DRAIN
Built 1945
NORMAN ROAD over COLUSA DRAIN
Built 2009
Bridge Details
- Structure #
- 11C0219
- Year Built
- 1950
- Length
- 6.7 m (22 ft)
- Max Span
- 6.7 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 1
- Daily Traffic
- 13
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.