ROAD #61 over WILLOW CREEK
6 MI E OF 99W · County 021, California · Built 1949 · 2 Lanes · 928 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
39.458036, -122.086283
This bridge is in worse condition than 93.3% of bridges in County 021. The average bridge in California is 0 years old; this one is 77 years old.
Nearby Bridges
ROAD 61 over PROVIDENT CANAL
Built 1948
ROAD SS over ORTIZ DRAIN
Built 1950
ROAD 62 over COLUSA DRAIN
Built 1960
ROAD #61 over COLUSA DRAIN
Built 1977
ROAD 57 over SWALLOW DRAIN
Built 1945
ROAD 64 over COLUSA DRAIN
Built 1941
ROAD 59 over COLUSA DRAIN
Built 1945
ROAD 66B over COLUSA DRAIN
Built 1940
NORMAN ROAD over WILLOW CREEK
Built 1973
ROAD 61 over PRINCETON CODORA CANAL
Built 1930
Bridge Details
- Structure #
- 11C0063
- Year Built
- 1949
- Reconstructed
- 1950
- Length
- 42.7 m (140.1 ft)
- Max Span
- 6.1 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 928
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $805,000
- Total Project Cost
- $1,352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.