RICH GULCH RD over RUSH CREEK

0.4 MI N OF SR 70 · County 063, California · Built 1955 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
09C0058
Year Built
1955
Reconstructed
1963
Length
13.4 m (44 ft)
Max Span
12.2 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
30
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.