RICH BAR RD over E BR N FK FEATHER RIVER

0.3 MI S OF SH 70 · County 063, California · Built 1932 · 1 Lanes · 10 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
09C0041
Year Built
1932
Length
36 m (118.1 ft)
Max Span
25.9 m
Width
3.9 m (12.8 ft)
Lanes
1
Daily Traffic
10
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$322,000
Total Project Cost
$540,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.