BAIR ROAD over SUPPLY CREEK
2 MI W OF LOOP RD · County 023, California · Built 1950 · 2 Lanes · 69 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.040925, -123.6968
This bridge is in worse condition than 58.1% of bridges in County 023. The average bridge in California is 0 years old; this one is 76 years old.
Nearby Bridges
IRR BIA RTE 541A over SUPPLY CREEK
Built 1966
STATE ROUTE 96 over SUPPLY CREEK
Built 1991
STATE ROUTE 96 over TRINITY RIVER
Built 1957
IRR BIA RTE 15 over HOSTLER CREEK
Built 1962
STATE ROUTE 96 over HOSTLER CREEK
Built 1992
STATE ROUTE 96 over HILLSIDE
Built 1985
STATE ROUTE 96 over HILLSIDE
Built 1985
PINE CREEK RD over SOCTISH CREEK
Built 1950
STATE ROUTE 96 over MILL CREEK
Built 1993
STATE ROUTE 96 over HILLSIDE
Built 1966
Bridge Details
- Structure #
- 04C0115
- Year Built
- 1950
- Length
- 12.5 m (41 ft)
- Max Span
- 11.9 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 69
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.