STATE ROUTE 96 over HILLSIDE

01-HUM-096-8.26 · County 023, California · Built 1985 · 2 Lanes · 2,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
04 0288
Year Built
1985
Length
50.4 m (165.4 ft)
Max Span
5.8 m
Width
4.2 m (13.8 ft)
Lanes
2
Daily Traffic
2,900
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.