US HIGHWAY 101 NB over MAD RIVER

01-HUM-101-89.63 · County 023, California · Built 2012 · 3 Lanes · 16,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
04 0311R
Year Built
2012
Length
228.6 m (750 ft)
Max Span
68.6 m
Width
15.6 m (51.2 ft)
Lanes
3
Daily Traffic
16,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.