U.S. HIGHWAY 101 over BOYD DRAW

01-HUM-101-89.44 · County 023, California · Built 1959 · 4 Lanes · 12,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
04 0085
Year Built
1959
Reconstructed
1991
Length
40.4 m (132.5 ft)
Max Span
8.1 m
Width
27.1 m (88.9 ft)
Lanes
4
Daily Traffic
12,900
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.