STATE ROUTE 161 over OREGON DRAIN
02-SIS-161-3.48 · County 093, California · Built 1946 · 2 Lanes · 655 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
42.002197, -121.824964
This bridge is in worse condition than 44.2% of bridges in County 093. The average bridge in California is 0 years old; this one is 80 years old.
Nearby Bridges
TOWNSHIP ROAD over ADY CANAL
Built 1999
TOWNSHIP ROAD over KLAMATH STRAITS DRAINAGE
Built 2010
US 97 (HWY 004) over KLAMATH STRAITS
Built 1981
AUTO TOUR ROAD over CANAL TURNOUT
Built 1963
PATROL RD UNIT 3A over CANAL TURNOUT
Built 1953
OCONNOR ROAD over IRRIGATION CANAL
Built 1966
MATNEY ROAD over IRRIGATION CANAL
Built 1969
MATNEY WAY over IRRIGATION CANAL
Built 1970
CHEYNE RD over IRRIGATION CANAL
Built 1974
OLD MIDLAND ROAD over IRRIGATION CANAL
Built 1998
Bridge Details
- Structure #
- 02 0062
- Year Built
- 1946
- Length
- 8.2 m (26.9 ft)
- Max Span
- 3.7 m
- Lanes
- 2
- Daily Traffic
- 655
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.