SALT CREEK RD over SALT CREEK
0.1 MI N/O REQUA RD · County 015, California · Built 1975 · 1 Lanes · 5 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.553631, -124.060769
This bridge is in worse condition than 63.9% of bridges in County 015. The average bridge in California is 0 years old; this one is 51 years old.
Nearby Bridges
REQUA ROAD over SALT CREEK
Built 1958
REQUA ROAD over HUNTER CREEK
Built 1949
U.S. HIGHWAY 101 over PANTHER CREEK
Built 2024
U.S. HIGHWAY 101 over HUNTER CREEK
Built 2023
MINOT CREEK ROAD over MYNOT CREEK
Built 2005
U.S. HIGHWAY 101 over MINOT CREEK
Built 1957
U.S. HIGHWAY 101 over HIGH PRAIRIE CREEK
Built 1957
CHAPMAN STREET over HOPPOW CREEK
Built 1965
S101-CHAPMAN ST RP over HOPPOW CREEK
Built 1965
W169-N101 CONNECTR over HOPPOW CREEK
Built 1965
Bridge Details
- Structure #
- 01C0020
- Year Built
- 1975
- Length
- 15.9 m (52.2 ft)
- Max Span
- 15.2 m
- Width
- 4 m (13.1 ft)
- Lanes
- 1
- Daily Traffic
- 5
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.