U.S. HIGHWAY 101 over HUNTER CREEK

01-DN-101-8.51 · County 015, California · Built 2023 · 2 Lanes · 4,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
01 0086
Year Built
2023
Length
40.5 m (132.9 ft)
Max Span
18.7 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
4,900
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.