ARKANSAS HWY 25 over DAM SPILLWAY

3 MI. NE OF HEBER SPRINGS · County 023, Arkansas · Built 1964 · 2 Lanes · 6,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
AHTD000000M3512
Year Built
1964
Length
87.7 m (287.7 ft)
Max Span
14.6 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
6,200
Material
Steel
Design
Girder and Floorbeam System
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$262,000
Total Project Cost
$393,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.