AR Hwy 91 over Lick Pond Slough

5 miles SE of Hoxie · County 075, Arkansas · Built 2023 · 2 Lanes · 540 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
0000000000X1707
Year Built
2023
Length
13.8 m (45.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
540
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.