Interstate 30 over P.C. AVE RF Dr/AR River

1.4 MI S JCT I-40 · County 119, Arkansas · Built 2024 · 6 Lanes · 133,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0000000000A7490
Year Built
2024
Length
1025.2 m (3363.5 ft)
Max Span
114.3 m
Width
21 m (68.9 ft)
Lanes
6
Daily Traffic
133,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.