US 167 Sharp Co. over PINEY FORK

11.31 MI N INDEPENDENCE · County 135, Arkansas · Built 1928 · 2 Lanes · 3,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
0000000000A0798
Year Built
1928
Reconstructed
1955
Length
61.6 m (202.1 ft)
Max Span
30.8 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
3,400
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$781,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.