CR N243 - J over DITCH #12
1 Mi N of Manila · County 093, Arkansas · Built 1988 · 2 Lanes · 145 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.916358, -90.15915
This bridge is in worse condition than 21.4% of bridges in County 093. The average bridge in Arkansas is 0 years old; this one is 38 years old.
Nearby Bridges
SH 77-01- LM 9.91 over DREDGE BOAT CREEK #2
Built 1989
SH 77-01- LM 10.91 over DREDGE BOAT CREEK NO 1
Built 1996
CR 35-J 911=N243 over DITCH NO. 10
Built 1991
CR 164-J(911=N175) over Dredge Boat Crk/#12
Built 1988
SH 119-05- LM 1.01 over DRAINAGE DITCH NUMBER 10
Built 1965
SH 18-05- LM 5.20 over Ditch No 16
Built 2015
SH 77-01- LM 7.19 over BUFFALO CREEK
Built 1986
SH 119-05- LM 1.69 over BUFFALO DITCH
Built 1985
SH 119-05- LM 2.30 over BUFFALO DITCH
Built 1985
SH 77-02- LM 0.71 over DITCH NO 13
Built 2024
Bridge Details
- Structure #
- 000000000020681
- Year Built
- 1988
- Length
- 24.5 m (80.4 ft)
- Max Span
- 8 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 145
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.