Sulphur Springs Rd over Sulphur Creek

3.5 Mi N Jct SH 8 · County 097, Arkansas · Built 1974 · 1 Lanes · 110 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000015484
Year Built
1974
Length
10.7 m (35.1 ft)
Max Span
5.2 m
Width
3.8 m (12.5 ft)
Lanes
1
Daily Traffic
110
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$20,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.