Old River/Z-D/8.82 over Ditch Number 10

8.82 Mi Se Int 30 & 6 · County 035, Arkansas · Built 1950 · 2 Lanes · 12 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000012250
Year Built
1950
Length
9.8 m (32.2 ft)
Max Span
9.8 m
Width
5.7 m (18.7 ft)
Lanes
2
Daily Traffic
12
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.