Union Chapel Rd over Creben Creek

0.8 Mi E Jct SH 92 & CR 5 · County 029, Arkansas · Built 1978 · 2 Lanes · 315 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000011686
Year Built
1978
Reconstructed
2014
Length
12.2 m (40 ft)
Max Span
5.2 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
315
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.