SH 7-10 Log 16.70 over Middle Fork Saline River

.79 MI SE OF PERRY CO LIN · County 051, Arkansas · Built 2021 · 2 Lanes · 990 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000007464
Year Built
2021
Length
61.9 m (203.1 ft)
Max Span
24.4 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
990
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.