SH 25/Indepen Co. over PFEIFER CREEK

.35 Mi. E. SH233 & 25 JCT · County 063, Arkansas · Built 2006 · 2 Lanes · 5,479 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000007029
Year Built
2006
Length
61.6 m (202.1 ft)
Max Span
15.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
5,479
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.