US 463-03 LM 2.51 over Bayou Bartholomew

0.34 Mi N I-530-PineBluff · County 069, Arkansas · Built 1990 · 4 Lanes · 15,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000006225
Year Built
1990
Length
91.2 m (299.2 ft)
Max Span
15.2 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
15,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.