SH 275 S-2 LM 0.80 over BAYOU LAPILE RELIEF

0.86 MI N JCT US 82 · County 139, Arkansas · Built 1968 · 2 Lanes · 650 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005163
Year Built
1968
Length
34.7 m (113.8 ft)
Max Span
5.8 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
650
Material
Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.