SH 290- 1 Log 2.65 over MOUNT CARMEL CREEK

2.65 MI E JCT SH 290 & 7 · County 051, Arkansas · Built 1968 · 2 Lanes · 2,162 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005145
Year Built
1968
Length
32 m (105 ft)
Max Span
10.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,162
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.