CR 61 Izard County over PINEY FORK

1.35 MI NE SH 289 AT ZION · County 065, Arkansas · Built 1983 · 2 Lanes · 170 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000004470
Year Built
1983
Length
41.8 m (137.1 ft)
Max Span
13.7 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
170
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.