US 165-05 LM 30.42 over Hurricane Bayou

1.2 Mi E SH 11-LodgeCornr · County 001, Arkansas · Built 1953 · 2 Lanes · 2,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000002890
Year Built
1953
Length
22.9 m (75.1 ft)
Max Span
7.6 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
2,200
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.