US 65 over Pickle Gap Creek

2.0 MI N OF CONWAY · County 045, Arkansas · Built 1939 · 5 Lanes · 26,736 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000002022
Year Built
1939
Reconstructed
1986
Length
21.3 m (69.9 ft)
Max Span
10.7 m
Width
21.6 m (70.9 ft)
Lanes
5
Daily Traffic
26,736
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.