US 67 S-5 LM 0.60 over CANEY CREEK

.6 MI N JCT SH 53 · County 019, Arkansas · Built 1931 · 2 Lanes · 5,904 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001476
Year Built
1931
Length
42.7 m (140.1 ft)
Max Span
10.7 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
5,904
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$908,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.