US 79B S-4BLM 3.79 over PALMER BAYOU

1.55 MI SW JCT US79 SH4 · County 103, Arkansas · Built 1929 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000001072
Year Built
1929
Length
331 m (1086 ft)
Max Span
10.7 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
2,300
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$2,460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.