THUNDERBIRD STREET over N LITCHFIELD ROAD

0.7 MI. NORTH OF SOUTH G · County 013, Arizona · Built 2007 · 4 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
AFAZNUEX00008
Year Built
2007
Length
37.1 m (121.7 ft)
Max Span
18.5 m
Width
21.1 m (69.2 ft)
Lanes
4
Daily Traffic
5,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
Other
Last Inspected
N/A
Est. Improvement
$60,000
Total Project Cost
$90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.