TUZIGOOT APPROACH over VERDE RIVER
ALT U.S. ROUTE 89 TO ROUT · County 025, Arizona · Built 1966 · 2 Lanes · 200 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
34.767558, -112.0401
This bridge is in worse condition than 73.1% of bridges in County 025. The average bridge in Arizona is 0 years old; this one is 60 years old.
Nearby Bridges
Broadway Street over Deception Gulch
Built 1942
Old Clarkdale Hwy over Mescal Gulch
Built 1921
Broadway Street over Mescal Gulch
Built 1941
Broadway St over Bitter Creek
Built 1917
SR 89A over Wash
Built 1964
Park Access Rd over Verde River
Built 1994
SR 89A over Mescal Gulch
Built 1964
Main Park Rd over Wash
Built 1994
IRR BIA RTE 105 over BITTER CREEK
Built 1980
Pima Street over Blowout Wash
Built 1936
Bridge Details
- Structure #
- 8700001P0000000
- Year Built
- 1966
- Length
- 154.5 m (506.9 ft)
- Max Span
- 33.7 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- National Park Service
- Last Inspected
- N/A
- Est. Improvement
- $175,000
- Total Project Cost
- $263,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.