Forest 80 over Crevice
3.25 n/o Apache Trail · County 013, Arizona · Built 2023 · 2 Lanes · 30 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.574719, -111.354764
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 3 years old.
Bridge Details
- Structure #
- 3357
- Year Built
- 2023
- Length
- 29.9 m (98.1 ft)
- Max Span
- 29.9 m
- Width
- 5.2 m (17.1 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Reclamation
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.