I 10 over Rillito Creek
9.7 mi N Jct I-19 · County 019, Arizona · Built 2023 · 10 Lanes · 136,020 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
32.3156, -111.0464
This bridge is in worse condition than 68% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 3 years old.
Nearby Bridges
EB Frontage Road over Rillito Creek
Built 2001
WB Frontage Road over Rillito Creek
Built 2001
Courtney Crossing over Wildwood Wash
Built 1998
I-10 over Orange Grove Rd
Built 2023
Sunset Road over Santa Cruz River
Built 2017
Thornydale Road over Carmack Wash
Built 1983
Camino Del Tierra over Carmack Wash RCB
Built 1987
I 10 over Canada Del Oro Wash
Built 2023
EB Frontage Road over Canada del Oro Wash
Built 2000
WB Frontage Road over Canada Del Oro Wash
Built 1999
Bridge Details
- Structure #
- 20210
- Year Built
- 2023
- Length
- 108.2 m (355 ft)
- Max Span
- 35.8 m
- Width
- 52.7 m (172.9 ft)
- Lanes
- 10
- Daily Traffic
- 136,020
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.