John Wayne Pkwy over Maricopa-Casa Grande Hwy
1mi S of Smith Enke Rd · County 013, Arizona · Built 2019 · 6 Lanes · 24,901 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.0551, -112.047
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 7 years old.
Nearby Bridges
SR 347 over Sta Cruz Wash
Built 1994
John Wayne Pkwy over Union Pacific Railroad
Built 2023
Honeycutt Rd over Santa Rosa Wash
Built 2010
Maricopa-CG Hwy over Santa Rosa Wash
Built 2004
Smith-Enke Road over Santa Rosa Wash
Built 2006
Smith-Enke Rd over Santa Rosa Wash
Built 2006
Stonegate Rd over Drainage Channel
Built 2008
IRR BIA RTE 14 over VEKOL WASH
Built 1989
Honeycutt Rd over Wash
Built 2008
Driveway #1 over Drainage Channel
Built 2008
Bridge Details
- Structure #
- 20153
- Year Built
- 2019
- Length
- 26.5 m (86.9 ft)
- Max Span
- 24.4 m
- Width
- 41.8 m (137.1 ft)
- Lanes
- 6
- Daily Traffic
- 24,901
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.