SR202L Rp 202N-10W over Roosevelt St

0.5 mil south of I-10 · County 013, Arizona · Built 2019 · 2 Lanes · 8,509 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
20149
Year Built
2019
Length
31.1 m (102 ft)
Max Span
29.6 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
8,509
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.