US 60 over Pinto Creek

8.8 mi W Jct SR 88 · County 007, Arizona · Built 2021 · 2 Lanes · 8,079 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
20077
Year Built
2021
Length
212.1 m (695.9 ft)
Max Span
61 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
8,079
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.