Ajo Way over Santa Cruz River

W Junction of 19 · County 019, Arizona · Built 2019 · 6 Lanes · 46,149 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
20061
Year Built
2019
Length
86 m (282.2 ft)
Max Span
41.8 m
Width
36.1 m (118.4 ft)
Lanes
6
Daily Traffic
46,149
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.