Phoenix Avenue over Rio De Flag

50 ft W Jct Beaver St · County 005, Arizona · Built 2022 · 2 Lanes · 1,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
11742
Year Built
2022
Length
7.9 m (25.9 ft)
Max Span
3.7 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
1,500
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.