Valencia Rd over Small Wash
S of Jnc SR86 · County 019, Arizona · Built 2018 · 2 Lanes · 8,881 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
32.175556, -111.054444
This bridge is in worse condition than 68% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 8 years old.
Nearby Bridges
IRR SR 86 over Wash
Built 1968
IRR SR 86 over Wash
Built 1968
Kinney Road over Medium Wash
Built 1972
IRR SR 86 over Wash
Built 1972
S Kinney Rd over Wash
Built 2021
IRR SR 86 over Wash
Built 1972
Kinney Road over Medium Wash
Built 1987
Starr Pass Blvd over Wash
Built 1993
La Cholla Blvd over Wash
Built 1997
Players Club Drive over Wash
Built 1993
Bridge Details
- Structure #
- 11615
- Year Built
- 2018
- Length
- 9.8 m (32.2 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 8,881
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.