Westland Rd over Drainage Basin
Int. 29th AV +Westland Rd · County 013, Arizona · Built 2015 · 2 Lanes · 1,010 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
33.773128, -112.337797
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 11 years old.
Nearby Bridges
Vistancia Blvd over CAP Canal
Built 2013
N Vistancia Blvd over Drainage Basin
Built 2004
Caterpiller TNK RD over CAP Canal
Built 1981
Lone Mt Pkwy over Drainage Basin
Built 2004
Sunrise Point over White Peak Wash & Ped
Built 2006
Lone Mountain Pkwy over Wash
Built 2004
Sunset Point over White Peak Wash & Ped
Built 2006
Sunset Point over Twin Buttes Wash & Ped
Built 2006
El Mirage Rd over Wash
Built 2020
Ridgeline Road over White Peak Wash & Ped
Built 2006
Bridge Details
- Structure #
- 11488
- Year Built
- 2015
- Length
- 20.1 m (65.9 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 1,010
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.