Windrow Boulevard over Durango Regional Drain
0.04 mi S of Heber Road · County 013, Arizona · Built 2003 · 2 Lanes · 1,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.4139, -112.2639
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 23 years old.
Nearby Bridges
92nd Drive over Durango Regional Drain
Built 2004
99th Avenue over Durango Regional Drain
Built 2002
91st Avenue over Durango Reg Conv Channel
Built 2019
Superior Avenue over Dry Wash
Built 2010
97th Avenue over Dry Wash
Built 2010
Crown King Road over Dry Wash
Built 2009
99th Avenue over Dry Wash
Built 2009
Country Place Blvd over Dry Wash
Built 2009
Country Place Blvd over Durango Regional Drain
Built 2002
103rd Avenue over Durango Reg Conv Channel
Built 2019
Bridge Details
- Structure #
- 11416
- Year Built
- 2003
- Length
- 10.7 m (35.1 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.