Northern Parkway over Agua Fria River

0.4 mi E of El Mirage · County 013, Arizona · Built 2020 · 6 Lanes · 22,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
11353
Year Built
2020
Length
178.9 m (586.9 ft)
Max Span
36 m
Width
37.1 m (121.7 ft)
Lanes
6
Daily Traffic
22,700
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.