Nocona Lane over Dry Wash
0.02 mi W of Freemont Rd · County 013, Arizona · Built 2013 · 2 Lanes · 250 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.6951, -111.9952
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 13 years old.
Nearby Bridges
Roughrider Road over Dry wash
Built 2013
Rough Rider Road over Dry Wash
Built 2005
Deer Valley Rd over Dry wash
Built 2012
Deer Valley Rd over Dry wash
Built 2012
Deer Valley Rd over Dry wash
Built 2012
Black Mountain Pkw over Dry Wash
Built 2013
Lone Cactus Drive over Dry Wash
Built 2013
Cashman Dr over West Wash
Built 1997
Deer Valley Road over West Wash
Built 1997
Mayo Blvd over Dry Wash
Built 2009
Bridge Details
- Structure #
- 11348
- Year Built
- 2013
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.