Desert Camp Dr over Wash
S of E Thompson Peak Pkwy · County 013, Arizona · Built 1996 · 2 Lanes · 650 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.6726, -111.8834
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 30 years old.
Nearby Bridges
90th. Place over Wash
Built 1997
Thompson Peak Pkwy over Wash
Built 1997
Thompson Peak Pkwy over Wash
Built 1997
Thompson Peak Pkwy over Wash
Built 2007
Thompson Peak Pkwy over Wash
Built 2001
Thompson Peak Pkwy over Wash Talon Golf Path
Built 1997
Thompson Peak Pkwy over Talon Golf Path
Built 1997
Downing-Olson Dr over Drain Channel
Built 1988
Downing-Olson Dr over Drain Channel
Built 1988
94th Street over Drain Channel
Built 1988
Bridge Details
- Structure #
- 11262
- Year Built
- 1996
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Width
- 19.5 m (64 ft)
- Lanes
- 2
- Daily Traffic
- 650
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.