Bell Rd WB over Reata Pass Wash

W of N 98th St · County 013, Arizona · Built 2008 · 2 Lanes · 7,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
11249
Year Built
2008
Length
81.7 m (268 ft)
Max Span
20.1 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
7,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.