STETSON VALLEY PKW over DRY WASH
S/O EL CORTEZ TRAIL · County 013, Arizona · Built 2005 · 4 Lanes · 7,776 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.7177, -112.1708
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 21 years old.
Nearby Bridges
49TH LANE over DRY WASH
Built 2007
RANGE MULE DR over DRY WASH
Built 2005
55TH AVE over DRY WASH
Built 2005
Tether Trail over Dry wash
Built 2006
Happy Valley Road over Dry Wash
Built 2006
Buckskin Trail over Dry wash
Built 1999
Happy Valley Road over Dry Wash
Built 1991
Whispering Wind Dr over Dry Wash
Built 1989
51st Avenue over CAP Canal
Built 1979
Alameda Rd over Dry Wash
Built 1989
Bridge Details
- Structure #
- 11125
- Year Built
- 2005
- Length
- 10.1 m (33.1 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 7,776
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.