59th Ave over Laveen Con Channel

59th Ave S/O Baseline Rd · County 013, Arizona · Built 2009 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
11114
Year Built
2009
Length
13.1 m (43 ft)
Max Span
3 m
Width
42.6 m (139.8 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.