Diamond Bar Rd over Wash
2.6 mi NE Jct Co Hwy 25 · County 015, Arizona · Built 2009 · 2 Lanes · 200 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
35.883194, -114.047889
This bridge is in worse condition than 70% of bridges in County 015. The average bridge in Arizona is 0 years old; this one is 17 years old.
Nearby Bridges
IRR BIA ROUTE 1 over DRY RUN
Built 2009
IRR BIA ROUTE 261 over DRY RUN
Built 2009
IRR BIA ROUTE 1 over DRY RUN
Built 2014
IRR BIA ROUTE 1 over DRY RUN
Built 2014
IRR BIA ROUTE 1 over DRY RUN
Built 2014
IRR BIA ROUTE 1 over DRY RUN
Built 2014
IRR BIA ROUTE 1 over DRY RUN
Built 2014
IRR BIA ROUTE 1 over DRY RUN
Built 2014
IRR BIA ROUTE 1 over DRY RUN
Built 2014
IRR BIA ROUTE 1 over DRY RUN
Built 2014
Bridge Details
- Structure #
- 11103
- Year Built
- 2009
- Length
- 8.2 m (26.9 ft)
- Max Span
- 6.1 m
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.