Sonoran Desert Dr. over Cave Creek

4.7 mi E of Paloma Pkwy · County 013, Arizona · Built 2012 · 2 Lanes · 7,271 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
10980
Year Built
2012
Length
62.8 m (206 ft)
Max Span
33.7 m
Width
20.4 m (66.9 ft)
Lanes
2
Daily Traffic
7,271
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.